Minimum Qualifying Criterion:
Education: B. Tech in Electrical Engineering
Experience: 10 + years
Roles & Responsibilities:
- Assessing Grid Connection feasibility at various ISTS/In-STS substations for RE projects (Solar + Wind). Shall have good understanding of power systems & knowledge on CTU & STU networks & plans.
- Applying for Grid Connectivity in CTU/STU and co-ordination with concerned STU/CTU for obtaining Connectivity and signing connection agreements.
- Required coordination for Estimate preparation & approval for Evacuation system (Transmission line & Switchyard ) from STU/CTU.
- Required coordination for approvals of Engineering Drawing & Documents in CTU/STU/Discoms and other statutory in regards of Evacuation system.
- Required Co-ordination for Section 68 & 164 approvals, PTCC approvals, Forest clearances, NH crossings, Railways crossings, Line crossings, River crossing, Civil aviation, Defense aviation, etc. & other approvals in transmission lines.
- Required Co-ordination for Metering Scheme & Telemetry approvals from concerned authorities for RE plants.
- Required coordination for all evacuation related approvals, including NRLDC registration, CON 4, CON 5, CON 6 applications in ISTS connected Plants.
- Required coordination for obtaining work completion reports & final Grid connectivity.
- Required coordination for obtaining synchronization & charging permission for RE plants from respective SLDC/CTU/STU/Discoms.
- Making communication to CTU/STU/NRLDC/SLDC/CEA and other statutory bodies as and when required.
* The candidate must be willing to travel to various STU/CTU offices, site locations, places as per requirement.